1-800-953-3229
(843) 221-4311

Replacement order

Most of the time, elevators are being installed in new buildings when you have time to schedule shipment within standard delays. But sometimes, being able to acquire your hydraulic components faster can make the difference between winning or losing the bid on a contract.

In these special cases, contact our team to obtain the delivery time that will suit your needs. These delays always correspond to the period between the approval of the drawings and the delivery of the order from our facilities.

Please click here to reach our surveys